Changes

Jump to navigation Jump to search
m
Line 61: Line 61:  
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
 
*''f''' = Design infiltration rate in mm/hr, and
 
*''f''' = Design infiltration rate in mm/hr, and
*48 is the desired drainage time in hours
+
*48 is the desired drainage time of the ponding in hours
 
*0.4 is the void ratio of [[reservoir gravel|clear stone]] *Note that conceptually the drainage of the ponded area is limited by ex-filtration at the base of the practice.}}
 
*0.4 is the void ratio of [[reservoir gravel|clear stone]] *Note that conceptually the drainage of the ponded area is limited by ex-filtration at the base of the practice.}}
 
* Step 5: Sum total depth of bioretention, and compare to available space above water table and bedrock. Adjust if necessary.
 
* Step 5: Sum total depth of bioretention, and compare to available space above water table and bedrock. Adjust if necessary.
8,255

edits

Navigation menu