Changes

Jump to navigation Jump to search
m
Line 49: Line 49:  
As the foundation depth is increased, the total height of the check dam (effective height plus foundation depth) should not exceed the permissible, maximum total height.
 
As the foundation depth is increased, the total height of the check dam (effective height plus foundation depth) should not exceed the permissible, maximum total height.
   −
==Example Calculation==
+
===Example Calculation===
 
An enhanced swale of 42 m has an existing longitudinal slope of 6 %.  The underlying soil has been amended to infiltrate at 16 mm/hr (after safety correction applied); the regulatory authority requires that ponded water must not remain for over 48 hours.
 
An enhanced swale of 42 m has an existing longitudinal slope of 6 %.  The underlying soil has been amended to infiltrate at 16 mm/hr (after safety correction applied); the regulatory authority requires that ponded water must not remain for over 48 hours.
 
The maximum height of the check dams (h) to prevent extended ponding is::
 
The maximum height of the check dams (h) to prevent extended ponding is::
8,255

edits

Navigation menu