Changes

Jump to: navigation, search

Check dams

2 bytes added, 1 year ago
m
no edit summary
{{Textbox|1=Check dams:
*may be constructed of any resilient and waterproof material, including: rock gabions, earth berms, coarse aggregate or rip-rap, concrete, metal or pre-treated timber. Rocks used in check dams should have median diameter 25-75 mm.
*for enhanced swales may be up to 0.6 m in height; the maximum design depth of ponded water should be ≤ 0.6 m.
*designed for higher flow velocities should have spillways incorporated into their profile, to direct water to the centre of the swale.

Navigation menu