Changes

Jump to navigation Jump to search
m
Line 84: Line 84:  
* Where multiple test are carried out, they should be planned equidistant and mapped accordingly.  
 
* Where multiple test are carried out, they should be planned equidistant and mapped accordingly.  
 
* The recommendations above are guidelines. Additional tests should be conducted if local conditions indicate significant variability in soil types, geology, water table levels, depth and type of bedrock, topography, etc.
 
* The recommendations above are guidelines. Additional tests should be conducted if local conditions indicate significant variability in soil types, geology, water table levels, depth and type of bedrock, topography, etc.
* Similarly, uniform site conditions may indicate that fewer test pits are required. Excessive testing and disturbance of the site prior to construction is not recommended. <ref>Christopher B. Burke Engineering LLC. (2009). Soil Infiltration Testing Protocol SOIL INFILTRATION TESTING PROTOCOL Purpose of this Protocol Who Should Conduct Testing. Retrieved from https://www.in.gov/ocra/files/Appendix F - Soil Infiltration Testing Protocol.pdf</ref>
+
* Similarly, uniform site conditions may indicate that fewer test pits are required. '''Excessive testing and disturbance of the site prior to construction is not recommended.''' <ref>Christopher B. Burke Engineering LLC. (2009). Soil Infiltration Testing Protocol SOIL INFILTRATION TESTING PROTOCOL Purpose of this Protocol Who Should Conduct Testing. Retrieved from https://www.in.gov/ocra/files/Appendix F - Soil Infiltration Testing Protocol.pdf</ref>
 
----
 
----
8,255

edits

Navigation menu