| Prior to performing testing and developing a detailed site plan, existing site conditions should be inventoried and mapped including, but not limited to: | | Prior to performing testing and developing a detailed site plan, existing site conditions should be inventoried and mapped including, but not limited to: |
− | | + | #Surficial geology and underlying stratigraphy; |
− | *Surficial geology and underlying stratigraphy;
| + | #Watercourses (perennial and intermittent), water bodies, wetlands and floodplains; |
− | *Watercourses (perennial and intermittent), water bodies, wetlands and floodplains;
| + | #Small headwater drainage features; |
− | *Small headwater drainage features;
| + | #Topography, slope, and drainage patterns; |
− | *Topography, slope, and drainage patterns;
| + | #Existing land cover and land use; |
− | *Existing land cover and land use;
| + | #Natural heritage conservation areas; and |
− | *Natural heritage conservation areas; and
| + | #Other man-made features or conditions that may impact design such as existing nearby structures (buildings, infrastructure, etc.). |
− | *Other man-made features or conditions that may impact design such as existing nearby structures (buildings, infrastructure, etc.).
| |
| | | |
| A sketch plan or preliminary layout plan for the proposed development should be evaluated, including: | | A sketch plan or preliminary layout plan for the proposed development should be evaluated, including: |
| + | #The preliminary grading plan and areas of cut and fill; |
| + | #The location and water surface elevation of all existing, and location of proposed water supply sources and wells; |
| + | #The location of all existing and proposed on-site wastewater (septic) systems; |
| + | #The location of other features of note such as utility rights-of-way, water and sewer lines, etc.; |
| + | #Existing data from borehole, well and geophysical testing; and |
| + | #Proposed location of development features (buildings, roads, utilities, etc.). |
| | | |
− | *The preliminary grading plan and areas of cut and fill;
| |
− | *The location and water surface elevation of all existing, and location of proposed water supply sources and wells;
| |
− | *The location of all existing and proposed on-site wastewater (septic) systems;
| |
− | *The location of other features of note such as utility rights-of-way, water and sewer lines, etc.;
| |
− | *Existing data from borehole, well and geophysical testing; and
| |
− | *Proposed location of development features (buildings, roads, utilities, etc.).
| |
| ===Sampling=== | | ===Sampling=== |
| The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows: | | The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows: |