Prior to performing testing and developing a detailed site plan, existing site conditions should be inventoried and mapped including, but not limited to:
 
Prior to performing testing and developing a detailed site plan, existing site conditions should be inventoried and mapped including, but not limited to:
 
+
#Surficial geology and underlying stratigraphy;
*Surficial geology and underlying stratigraphy;
+
#Watercourses (perennial and intermittent), water bodies, wetlands and floodplains;
*Watercourses (perennial and intermittent), water bodies, wetlands and floodplains;
+
#Small headwater drainage features;
*Small headwater drainage features;
+
#Topography, slope, and drainage patterns;
*Topography, slope, and drainage patterns;
+
#Existing land cover and land use;
*Existing land cover and land use;
+
#Natural heritage conservation areas; and
*Natural heritage conservation areas; and
+
#Other man-made features or conditions that may impact design such as existing nearby structures (buildings, infrastructure, etc.).
*Other man-made features or conditions that may impact design such as existing nearby structures (buildings, infrastructure, etc.).
      
A sketch plan or preliminary layout plan for the proposed development should be evaluated, including:
 
A sketch plan or preliminary layout plan for the proposed development should be evaluated, including:
 +
#The preliminary grading plan and areas of cut and fill;
 +
#The location and water surface elevation of all existing, and location of proposed water supply sources and wells;
 +
#The location of all existing and proposed on-site wastewater (septic) systems;
 +
#The location of other features of note such as utility rights-of-way, water and sewer lines, etc.;
 +
#Existing data from borehole, well and geophysical testing; and
 +
#Proposed location of development features (buildings, roads, utilities, etc.).
   −
*The preliminary grading plan and areas of cut and fill;
  −
*The location and water surface elevation of all existing, and location of proposed water supply sources and wells;
  −
*The location of all existing and proposed on-site wastewater (septic) systems;
  −
*The location of other features of note such as utility rights-of-way, water and sewer lines, etc.;
  −
*Existing data from borehole, well and geophysical testing; and
  −
*Proposed location of development features (buildings, roads, utilities, etc.).
   
===Sampling===
 
===Sampling===
 
The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:
 