Changes

Jump to navigation Jump to search
m
no edit summary
Line 3: Line 3:     
==How is it being used?==
 
==How is it being used?==
The first retrofit  in Ontario to incorporate a red sand filter system was the George Richardson stormwater management pond in Newmarket.<ref name=LSRCA/> Red sand was installed as the last part of a [[treatment train]] to function as a final polishing unit. The underground system was first lined with a bentonite liner to minimize groundwater exchange, with various layers of clear stone and red sand sandwiched between nonwoven [[geotextiles]]. The water is distributed via a system of perforated piping covering the top layer of the underground system just above the red sand filter media, with collector pipes located near the bottom. The system is estimated to have a reduction in phosphorus of 23 kg/year. <ref name=CVC>Credit Valley Conservation. George Richardson Stormwater Management Pond Retrofit. 2013. http://www.creditvalleyca.ca/wp-content/uploads/2013/08/CVC-Case-Study-George-Richardson_Aug_2013.pdf. Accessed September 8, 2017.</ref>
+
The first retrofit  in Ontario to incorporate a red sand filter system was the George Richardson stormwater management pond in Newmarket.<ref name=LSRCA/> Red sand was installed as the last part of a treatment train to function as a final polishing unit. The underground system was first lined with a bentonite liner to minimize groundwater exchange, with various layers of clear stone and red sand sandwiched between nonwoven [[geotextiles]]. The water is distributed via a system of perforated piping covering the top layer of the underground system just above the red sand filter media, with collector pipes located near the bottom. The system is estimated to have a reduction in phosphorus of 23 kg/year. <ref name=CVC>Credit Valley Conservation. George Richardson Stormwater Management Pond Retrofit. 2013. http://www.creditvalleyca.ca/wp-content/uploads/2013/08/CVC-Case-Study-George-Richardson_Aug_2013.pdf. Accessed September 8, 2017.</ref>
    
Another Ontario project was completed by the Upper Thames River Conservation Authority and Luckhart Transportation Limited, in which they retrofit an innovative wetland treatment system to test a red sand filter. This was the first of its kind for an agricultural application. In this project, a clear round stone was added to improve percolation and phosphorus retention.<ref>Upper Thames River Conservation Authority. Red Sand helps Protect Water Quality. 2014. http://thamesriver.on.ca/2014/11/11/red-sand-helps-protect-water-quality-november-11-2014/. Accessed September 8, 2017.</ref>
 
Another Ontario project was completed by the Upper Thames River Conservation Authority and Luckhart Transportation Limited, in which they retrofit an innovative wetland treatment system to test a red sand filter. This was the first of its kind for an agricultural application. In this project, a clear round stone was added to improve percolation and phosphorus retention.<ref>Upper Thames River Conservation Authority. Red Sand helps Protect Water Quality. 2014. http://thamesriver.on.ca/2014/11/11/red-sand-helps-protect-water-quality-november-11-2014/. Accessed September 8, 2017.</ref>
8,255

edits

Navigation menu