Changes

Jump to navigation Jump to search
m
no edit summary
Line 5: Line 5:  
*Zero-lot line projects with outdoor amenity requirements}}
 
*Zero-lot line projects with outdoor amenity requirements}}
   −
Ministry of Transportation do not permit blue roofs to form part of a SWM plan owing to concerns over long term maintenance; this affects relatively few projects. The concerns arise from instances where building operators have found outlet control structures blocked with leaves or other debris. Without understanding the purpose of the device, these have been removed to prevent recurrence of the blockage. A study in New York City found that a modular system of trays outperformed an outlet flow control device in stormwater management<ref>Bloomberg, M., & Strickland, C. H. (2012). NYC Green Infrastructure Plan: 2012 Green Infrastructure Pilot Monitoring Report. New York. Retrieved from http://www.nyc.gov/html/dep/pdf/green_infrastructure/2012_green_infrastructure_pilot_monitoring_report.pdf</ref>. It might reasonably be expected that a modular system would present fewer opportunities for complete failure from a single action, either through clogging or breakage of an storage element.     
+
The Ministry of Transportation do not permit blue roofs to form part of a SWM plan owing to concerns over long term maintenance; this affects relatively few projects<ref>Ontario Ministry of Transportation. (2016). Stormwater Management Requirements for Land Development Proposals. Retrieved March 7, 2018, from http://www.mto.gov.on.ca/english/publications/drainage/stormwater/section8.shtml#controls</ref>. The concerns arise from instances where building operators have found outlet control structures blocked with leaves or other debris. Without understanding the purpose of the device, these have been removed to prevent recurrence of the blockage. A study in New York City found that a modular system of trays outperformed an outlet flow control device in stormwater management<ref>Bloomberg, M., & Strickland, C. H. (2012). NYC Green Infrastructure Plan: 2012 Green Infrastructure Pilot Monitoring Report. New York. Retrieved from http://www.nyc.gov/html/dep/pdf/green_infrastructure/2012_green_infrastructure_pilot_monitoring_report.pdf</ref>. It might reasonably be expected that a modular system would present fewer opportunities for complete failure from a single action, either through clogging or breakage of an storage element.     
    
==Resources to review==
 
==Resources to review==
Line 14: Line 14:  
{{:Disclaimer}}
 
{{:Disclaimer}}
 
===Flow control devices===
 
===Flow control devices===
 +
*[http://www.wadedrains.com/product-index/roof-drains/3007-flow-control-roof-drain/ Wade Canada]
 
*[http://www.wattscanada.ca/pages/_products_details.asp?pid=3810 Watts Canada]
 
*[http://www.wattscanada.ca/pages/_products_details.asp?pid=3810 Watts Canada]
 
*[http://www.zurn.com/products/building-drainage/roof-drains/control-flow/z105#Features Zurn]
 
*[http://www.zurn.com/products/building-drainage/roof-drains/control-flow/z105#Features Zurn]
8,255

edits

Navigation menu