Changes

Jump to navigation Jump to search
m
Line 6: Line 6:  
*At least one pair of vertical cleanout pipes/wells should be included in the design, for inspection and periodic flushing of accumulated sediment. As most hydro-jetting apparatus used for this has some trouble accommodating narrow 90 deg bends, it is important that both ends of a perforated pipe be connected with a pair of 45 deg elbows/Y connectors instead.  
 
*At least one pair of vertical cleanout pipes/wells should be included in the design, for inspection and periodic flushing of accumulated sediment. As most hydro-jetting apparatus used for this has some trouble accommodating narrow 90 deg bends, it is important that both ends of a perforated pipe be connected with a pair of 45 deg elbows/Y connectors instead.  
 
{| class="wikitable"
 
{| class="wikitable"
|+Clean out spacing
+
|+Clean out spacing<ref>Province of Ontario. (2018). O. Reg. 332/12: BUILDING CODE. Retrieved February 23, 2018, from https://www.ontario.ca/laws/regulation/120332<ref>
 
|-
 
|-
 
! Pipe internal diameter (mm)
 
! Pipe internal diameter (mm)
8,255

edits

Navigation menu