Line 10:
Line 10:
#Apply 15-20 mm of [[topsoil]] over the TRM, without the use of heavy machinery which can tear the mat and/or compact the soil,
#Apply 15-20 mm of [[topsoil]] over the TRM, without the use of heavy machinery which can tear the mat and/or compact the soil,
#An [[Erosion control blankets| erosion control blanket]] may be applied to protect the surface through the first one or two years,
#An [[Erosion control blankets| erosion control blanket]] may be applied to protect the surface through the first one or two years,
−
#Irrigate until turf grass is established.
+
#Irrigate until [[turf|turf grass]] is established.
[[category: materials]]
[[category: materials]]