==Figures and drawings==
 
==Figures and drawings==
 
* Location plan in the report;
 
* Location plan in the report;
* Key Plan on the drawings;
+
* Key plan on the drawings;
 
* All watercourses and names of watercourses shown on all figures and drawings;
 
* All watercourses and names of watercourses shown on all figures and drawings;
 
* Pre-development and post-development drainage plans for hydrologic model(s) which include:
 
* Pre-development and post-development drainage plans for hydrologic model(s) which include:
Line 35: Line 35:  
* SWM facility design drawings and details;
 
* SWM facility design drawings and details;
 
* Erosion and sediment control plans;
 
* Erosion and sediment control plans;
 +
 
==Design Information==
 
==Design Information==
 
* Consistent hydrology modelling to be utilized for each development application and/or consistent with MESP/MSP/Studies.
 
* Consistent hydrology modelling to be utilized for each development application and/or consistent with MESP/MSP/Studies.