| ! Recommended depth (with underdrain pipe) | | ! Recommended depth (with underdrain pipe) |
| ! Recommended depth (no underdrain pipe) | | ! Recommended depth (no underdrain pipe) |
− | ! Typical void ratio (''V<sub>r</sub>'') | + | ! Typical void ratio (''V<sub>R</sub>'') |
| |- | | |- |
| | Ponding depth | | | Ponding depth |
Line 86: |
Line 86: |
| Note that narrow, linear bioretention features drain faster than round or blocky footprint geometries. | | Note that narrow, linear bioretention features drain faster than round or blocky footprint geometries. |
| *Begin the drainage time calculation by dividing the area of the practice (''A<sub>p</sub>'') by the perimeter (''P''). | | *Begin the drainage time calculation by dividing the area of the practice (''A<sub>p</sub>'') by the perimeter (''P''). |
− | | + | *To estimate the time (''t'') to fully drain the facility: |
− | ==Step 3, depth of bowl,''d<sub>b</sub>''==
| |
− | [[File:Sizing bio2.png|thumb|The duration of surface ponding is usually determined by the emptying of the facility below.]]
| |
− | <poem>
| |
− | The 'bowl' area is simply the depressed elevation of the surface compared to the surrounding areas; a space to permit temporary ponding.
| |
− | The depth of the bowl would not typically exceed 0.5 m due to safety concerns.
| |
− | Some jurisdictions or particular sites may demand a lower maximum depth of ponding. It is worth bearing in mind that in most cases this ponded water will only occur once or twice per year.
| |
− | The ponded water within the bowl should drain within 48 hrs. This addresses public concerns about [[mosquitoes]] and reduces the probability of losing vegetation due to saturated growing conditions.
| |
− | The drainage of the bowl is not usually constrained by the surface infiltration (filter media should drain > 25 mm/hr). The infiltration of water from the bowl is determined by the drainage of the filter media and reservoir into the soils.
| |
− | To estimate the time (''t'') to fully drain the facility: | |
| :<math>t=\frac{V_{R}A_{p}}{f'P}ln\left [ \frac{\left (d+ \frac{A_{p}}{P} \right )}{\left(\frac{A_{p}}{P}\right)}\right]</math> | | :<math>t=\frac{V_{R}A_{p}}{f'P}ln\left [ \frac{\left (d+ \frac{A_{p}}{P} \right )}{\left(\frac{A_{p}}{P}\right)}\right]</math> |
− | </poem> | + | {{Plainlist|1=Where: |
| + | *''V<sub>R</sub>'' is the void ratio of the media, |
| + | *''A<sub>p</sub>'' is the area of the practice (m<sup>2</sup>), |
| + | *''f''' is the design infiltration rate (mm/hr), and |
| + | .}} |
| | | |
| ==Groundwater mounding== | | ==Groundwater mounding== |