Line 34:
Line 34:
* SWM facility design drawings and details;
* SWM facility design drawings and details;
* Erosion and sediment control plans;
* Erosion and sediment control plans;
−
+
==Design Information==
−
+
* Consistent hydrology modelling to be utilized for each development application and/or consistent with MESP/MSP/Studies.
+
* Supporting information has been included for all modelling parameters and calculations.
+
*Stage-Storage-Discharge calculations provided for each SWM facility including design information on control and emergency overflow weirs.
+
*Flow and storage summary tables provided which reference the associated drainage area, catchment ID, outlet(s) and differentiate between controlled and uncontrolled areas.
+
*Identify and show seasonal high groundwater levels in report and on drawings;
+
*Per MOECC SWM manual, 2003 (i.e. Drainage area, required volume, slopes, forebay, etc.);
+
*The SWM report and drawings are to include a table summarizing required storage, provided storage and associated elevation and flow for the permanent pool, 25mm (extended detention), and 2 through 100 year return period storm events where applicable for each facility;
+
*An operations and maintenance manual should be included in the SWM Report for all LID facilities in accordance with municipal requirements;
+
*Complete information on proposed manufactured treatment devices is to be provided including current status under ETV protocols;
+
*An operations and maintenance manual is to be provided that includes a maintenance schedule;
+
===Quantity Control Section===
+
*Runoff coefficient or imperviousness calculations;
+
*Analysis using appropriate storm distributions;
+
*Pre-development peak flow (m<sup>3</sup>/s);
+
*Post-development uncontrolled peak flow (m<sup>3</sup>/s);
+
*Post-development controlled peak flow (m<sup>3</sup>/s);
+
*LID Facility Type;
+
*Stage – Storage – Discharge Table;
+
*Outlet design and calculations;
+
*Total storage required (m<sup>3</sup>);
+
*Total storage provided (m<sup>3</sup>);
+
*Table comparing provided versus required;
+
*Overland flow conveyance and design;
+
*External drainage conveyance (100 year and Regional);
+
2.2. Quality Control Section
+
• Level of Protection.
+
• Drainage Area to Facility in hectares.
+
• Percentage Impervious – total and directly connected areas.
+
• SWM Facility Monitoring and Maintenance Requirements.
+
3. Hazard Land Management
+
• Regional event and 1:100 year flood lines under existing and proposed conditions shown on appropriate plan drawings.
+
• Valley top of bank, stream erosion, steep slope allowances and meanderbelt assessed (confined stream systems only).
+
• Wetlands and required setbacks determined and identified on plans.
+
• Meanderbelt assessment and/or setback determined and identified on plans.
+
• Wave uprush and/or wind setup elevations calculated (Lake Simcoe Shoreline).
+
• “Limit of development” shown on plans.
+
• Survey and floodplain mapping submitted (As per minimum requirement in Appendix K).
+
• Hydraulic modelling and analysis including digital files (As per minimum requirements identified in Appendices C, I and K).
+
4. Other
+
Upon approval of the SWM design, a digital copy of the stormwater drainage plan is to be submitted including the location and size of the SWM facility in GIS format.
+
----
===Floodplain mapping and documentation minimum requirements===
===Floodplain mapping and documentation minimum requirements===
# Hydraulic sections with regulated floodplain elevations and cross-section identification;
# Hydraulic sections with regulated floodplain elevations and cross-section identification;