Changes

Jump to navigation Jump to search
m
Line 60: Line 60:  
Consultants are required for large-scale retrofit projects, specifically for the final screening of options, pre-design, detailed design, tender and contract documents, construction supervision and administration, and assumption and verification. Site contractors are also required for large-scale LID retrofits.
 
Consultants are required for large-scale retrofit projects, specifically for the final screening of options, pre-design, detailed design, tender and contract documents, construction supervision and administration, and assumption and verification. Site contractors are also required for large-scale LID retrofits.
   −
Ideally, contractors should be pre-qualified based on previous experience with similar LID projects.
+
Ideally, contractors should be pre-qualified based on previous experience with similar LID projects. Remember, the contractor with the lowest bid does not necessarily deliver the best product.
    
====Intensive public consultation====
 
====Intensive public consultation====
390

edits

Navigation menu