and towards waterways. Opportunities for P2 include locating
and towards waterways. Opportunities for P2 include locating
dumpsters on a flat concrete surface that does not slope
dumpsters on a flat concrete surface that does not slope
−
or drain to the storm drain system, installing a secondary
+
or drain to the storm drain system, installing a secondary containment
+
system such as a berm or curb around the dumpster, and closing and securing
+
lids properly when the dumpster is not being loaded or unloaded.
+
+
Education is a critical component in the implementation of pollution prevention measures.
+
Training your employees on both P2 procedures as well as the reasons behind them can change
+
attitudes toward pollution prevention. Employees may be more diligent in following P2
+
practices if they understand how it effects the quality of their drinking water.