Changes

Jump to navigation Jump to search
m
Line 125: Line 125:  
and towards waterways. Opportunities for P2 include locating
 
and towards waterways. Opportunities for P2 include locating
 
dumpsters on a flat concrete surface that does not slope
 
dumpsters on a flat concrete surface that does not slope
or drain to the storm drain system, installing a secondary
+
or drain to the storm drain system, installing a secondary containment
 +
system such as a berm or curb around the dumpster, and closing and securing
 +
lids properly when the dumpster is not being loaded or unloaded.
 +
 
 +
Education is a critical component in the implementation of pollution prevention measures.
 +
Training your employees on both P2 procedures as well as the reasons behind them can change
 +
attitudes toward pollution prevention. Employees may be more diligent in following P2
 +
practices if they understand how it effects the quality of their drinking water.
390

edits

Navigation menu