Changes

Jump to navigation Jump to search
m
no edit summary
Line 1: Line 1:  
<gallery mode="packed" widths=200px heights=200px>
 
<gallery mode="packed" widths=200px heights=200px>
 
7sigma RainGarden64.JPG|The sunken curb holds the edge of the asphalt pavement and lets water freely flow to the [[bioretention cell]] beside the 7sigma parking lot in Minneapolis, MN (USA)<br>Photo credit:[[Acknowledgements|BrianAsh]]
 
7sigma RainGarden64.JPG|The sunken curb holds the edge of the asphalt pavement and lets water freely flow to the [[bioretention cell]] beside the 7sigma parking lot in Minneapolis, MN (USA)<br>Photo credit:[[Acknowledgements|BrianAsh]]
Elm Drive Bioretention.JPG|The Peel District School Board's Adult Education Centre South school partnered with the City of Mississauga to manage runoff from the adjacent street, Elm Drive, on their property. This partnership benefits the City by giving it space to provide and enhanced level of stormwater treatment, and benefited the school through the construction of new parking lay-bys for students. The site is maintained by the City of Mississauga. Photo credit: CVC
+
Elm Drive Bioretention.JPG|[[Bioertention]] cells on Elm Drive, Mississauga, are lower then the adjacent road to accommodate a [[catch basin]] [[inlet]] between the paved surface and the cells. Photo credit: CVC
 
</gallery>
 
</gallery>
    
[[Category:Gallery]]
 
[[Category:Gallery]]
8,255

edits

Navigation menu