Before starting a large-scale retrofit project, consider the
 
Before starting a large-scale retrofit project, consider the
following distinctions that set these retrofits apart from smallscale
+
following distinctions that set these retrofits apart from small-scale
 
projects.
 
projects.
===Integration with long-term infrastructure
+
===Integration with long-term infrastructure replacement and rehabilitation plans===
replacement and rehabilitation plans===
   
Most large-scale LID retrofits must function with existing
 
Most large-scale LID retrofits must function with existing
 
site infrastructure, such as storm sewers, catch basins,
 
site infrastructure, such as storm sewers, catch basins,
Line 293: Line 292:  
have been set aside for a parking lot replacement could be
 
have been set aside for a parking lot replacement could be
 
transferred to a retrofit project.
 
transferred to a retrofit project.
 +
 
===Involvement of consultants and contractors===
 
===Involvement of consultants and contractors===
 
Consultants are required for large-scale retrofit projects,
 
Consultants are required for large-scale retrofit projects,