Changes

Jump to navigation Jump to search
m
no edit summary
Line 39: Line 39:  
#Verify that ladder access is proposed for vaults greater than four feet in height. [Section 4.2.3, 15e]
 
#Verify that ladder access is proposed for vaults greater than four feet in height. [Section 4.2.3, 15e]
 
#Verify that header pipes, at minimum 36-inch diameter, connected to manholes at each corner of the subsurface system are provided. Alternatively, smaller header pipes may be used if cleanouts are provided on every second manifold pipe/header pipe junction, on alternating sides of the SMP. [Section 4.2.3, 15f]
 
#Verify that header pipes, at minimum 36-inch diameter, connected to manholes at each corner of the subsurface system are provided. Alternatively, smaller header pipes may be used if cleanouts are provided on every second manifold pipe/header pipe junction, on alternating sides of the SMP. [Section 4.2.3, 15f]
 +
 +
==Materials checklist==
 +
#Verify that porous bituminous asphalt, if proposed, is specified on the plans as meeting the following specifications: [Section 4.2.4, 2]
 +
##Bituminous surface must be laid with a bituminous mix of 5.75% to 6% by weight dry aggregate.
 +
##In accordance with American Society of Testing and Materials (ASTM) D6390, drain down of the binder must be no greater than 0.3%.
 +
##Aggregate material in the asphalt must be clean, open-graded, and a minimum of 75% fractured with at least one fractured face by mechanical means of each individual particle larger than ¼-inch, and it must have the following gradations:
 +
 +
Porous Asphalt Binder Course Aggregate Gradation
 +
U.S. Standard Sieve Size Percent Passing By Weight
 +
1” 100%
 +
3/4” 90-100%
 +
1/2” 80-100%
 +
3/8” 50-80%
 +
#4 10-20%
 +
#8 5-10%
 +
#40 3-8%
 +
#200 0-3 %
 +
Porous Asphalt Wearing Course Aggregate Gradation
 +
U.S. Standard Sieve Size Percent Passing By Weight
 +
5/8” 100%
 +
1/2” 95-100%
 +
3/8” 70-95%
 +
#4 20-40%
 +
#8 10-20%
 +
#40 0-8%
 +
#200 0-3%
 +
 +
Neat asphalt binder modified with an elastomeric polymer to produce a binder meeting the requirements of PG 76-22 as specified in American Association of State Highway and Transportation Officials (AASHTO) MP-1. The elastomer polymer must be styrene-butadiene-styrene, or approved equal, applied at a rate of 3% by weight of the total binder.
 +
Hydrated lime should be added at a dosage rate of 1% by weight of the total dry aggregate to mixes containing granite.
 +
Hydrated lime must meet the requirements of ASTM C 977.
 +
The additive must be able to prevent the separation of the asphalt binder from the aggregate and achieve a required tensile strength ratio of at least 80% on the asphalt mix when tested in accordance with AASHTO T 283.
 +
The asphaltic mix must be tested for its resistance to stripping by water in accordance with ASTM D-1664.
 +
If the estimated coating area is not above 95%, anti-stripping agents must be added to the asphalt.
 +
The asphaltic mix must be tested for its resistance to stripping by water in accordance with ASTM D 3625. If the estimated coating area is not above 95%, anti-stripping agents must be added to the asphalt.
 +
Verify that porous concrete, if proposed, is specified on the plans as meeting the following specifications: [Section 4.2.4, 3]
 +
Porous concrete must use Portland Cement Type I or II conforming to ASTM C 150 or Portland Cement Type IP or IS conforming to ASTM C 595.
 +
Aggregate must be No. 8 coarse aggregate (3/8-inch to No. 16) per ASTM C 33 or No. 89 coarse aggregate (3/8-inch to No. 50) per ASTM D 448.
 +
An aggregate/cement ratio range of 4:1 to 4.5:1 and a water/cement ratio range of 0.34 to 0.40 should produce porous pavement of satisfactory properties in regard to permeability, load carrying capacity, and durability characteristics.
 +
 +
 +
Verify that permeable paver and grid systems, if proposed, are specified on the plans as meeting the following specifications: [Section 4.2.4, 4]
 +
#Permeable paver and grid systems must conform to manufacturer specifications.
 +
#The systems must have a minimum flow through rate of five inches per hour and a void percentage of no less than 10%.
 +
#Gravel used in interlocking concrete pavers or plastic grid systems must be well-graded and washed to ensure permeability.
 +
#Verify that stone designed for stormwater storage, if proposed, is specified on the plans as being uniformly graded, crushed, clean-washed stone and that it is noted that PWD defines “clean-washed” as having less than 0.5% wash loss, by mass, when tested per the AASHTO T-11 wash loss test. AASHTO No. 3 and No. 57 stone can meet this specification. [Section 4.2.4, 6a]
 +
#Verify that all aggregates used within a porous pavement system meets the following requirements: [Section 4.2.4, 6b]
 +
 +
Maximum wash loss: 0.5% per AASHTO T-11
 +
Minimum durability index: 35 per ASTM D3744
 +
Maximum abrasion: 10% for 100 revolutions and 50% for 500 revolutions per ASTM C131
 +
Verify that all choker course aggregate meets the specifications of AASHTO No. 57 and meets the gradation listed in Table 4.2-3 of the Manual. [Section 4.2.4, 6c]
 +
Verify that sand, if proposed, is specified on the plans to be AASHTO M-6 or ASTM C-33 sand and to have a grain size of 0.02 inches to 0.04 inches. [Section 4.2.4, 7]
 +
Verify that storage chambers for porous pavement structural SMPs, if proposed, are specified on the plans as meeting the following specifications: [Section 4.2.4, 8]
 +
Pipe used within a subsurface infiltration SMP must be continuously perforated and have a smooth interior with a minimum inner diameter of four inches.
 +
High-density polyethylene (HDPE) pipe, if proposed, must meet the specifications of AASHTO M252, Type S or AASHTO M294, Type S.
 +
Any pipe materials outside the SMP are to meet City Plumbing Code Standards.
 +
Verify that geotextile, if proposed, is specified on the plans to consist of polypropylene fibers and to meet the following specifications (AASHTO Class 1 or Class 2 geotextile is recommended): [Section 4.2.4, 9]
 +
Grab Tensile Strength (ASTM-D4632): ≥ 120 lbs
 +
Mullen Burst Strength (ASTM-D3786): ≥ 225 psi
 +
Flow Rate (ASTM-D4491): ≥ 95 gal/min/ft2
 +
UV Resistance after 500 hrs (ASTM-D4355): ≥ 70%
 +
Heat-set or heat-calendared fabrics are not permitted
 +
Verify that underdrains, if proposed, are made of continuously perforated HDPE plastic piping with a smooth interior and a minimum inner diameter of four inches. HDPE pipe must be specified on the plans to meet the specifications of AASHTO M252, Type S or AASHTO M294, Type S. [Section 4.2.4, 10]
 +
Verify that observation wells are specified on the plans as consisting of perforated plastic pipe with a minimum inner diameter of six inches. [Section 4.2.4, 12]
 +
Verify that cleanouts are made of rigid material with a smooth interior having a minimum inner diameter of four inches. [Section 4.2.4, 13]
 +
 +
     
8,255

edits

Navigation menu