Changes

Jump to navigation Jump to search
no edit summary
Line 76: Line 76:     
==Performance==
 
==Performance==
Permeable pavers can be classified according to the infiltration rate of the underlying subsoil into two categories:
+
Permeable pavers can be classified into two categories according to the infiltration rate of the underlying subsoil:
*Full Infiltration: Full infiltration designs are more effective because little if any of the pollutants generated on the impermeable surfaces leave the site as surface runoff.
+
*Full Infiltration: Full infiltration designs are more effective, because little if any of the pollutants generated on the impermeable surfaces leave the site as surface runoff
*Partial Infiltration: Partial infiltration designs with underdrains generate more runoff.
+
*Partial Infiltration: Partial infiltration designs with underdrains generate more runoff
 
Studies in North Carolina have shown the average curve number of permeable pavements to range from a low of 45 to a high of 89. <ref>Bean, E.Z., Hunt, W, F., Bidelspach, D.A. 2007a. Evaluation of Four Permeable Pavement Sites in Eastern North Carolina for Runoff Reduction and Water Quality Impacts. Journal of Irrigation and Drainage Engineering. Vol. 133. No. 6. pp. 583-592.</ref><br>
 
Studies in North Carolina have shown the average curve number of permeable pavements to range from a low of 45 to a high of 89. <ref>Bean, E.Z., Hunt, W, F., Bidelspach, D.A. 2007a. Evaluation of Four Permeable Pavement Sites in Eastern North Carolina for Runoff Reduction and Water Quality Impacts. Journal of Irrigation and Drainage Engineering. Vol. 133. No. 6. pp. 583-592.</ref><br>
Partial infiltration designs with underdrains generate more runoff, and as a result, are often used in studies investigating the water quality impact of permeable pavements on surface waters. These studies show load reductions above 50% for total suspended solids, most metals, and hydrocarbons <ref>Legret, M and V. Colandani. 1999. Effects of a porous pavement structure with a reservoir structure on runoff water: water quality and fate of metals. Water Science and Technology. 39(2): 111-117</ref> <ref>Pratt, C.J., Mantle, J.D.G., Schofield, P.A. 1995. UK research into the performance of permeable pavement reservoir structures in controlling stormwater discharge quantity and quality. Water Science Technology. Vol. 32. No. 1. pp. 63-69.</ref> <br>
+
Partial infiltration designs with underdrains generate more runoff, and as a result, are often used in studies investigating the water quality impact of permeable pavements on surface waters. These studies show load reductions above 50% for total suspended solids, most metals and hydrocarbons <ref>Legret, M and V. Colandani. 1999. Effects of a porous pavement structure with a reservoir structure on runoff water: water quality and fate of metals. Water Science and Technology. 39(2): 111-117</ref> <ref>Pratt, C.J., Mantle, J.D.G., Schofield, P.A. 1995. UK research into the performance of permeable pavement reservoir structures in controlling stormwater discharge quantity and quality. Water Science Technology. Vol. 32. No. 1. pp. 63-69.</ref> <br>
 
As with all stormwater infiltration practices, risk of groundwater contamination from infiltration of runoff laden with road de-icing salt constituents (typically sodium and chloride) is a significant concern. Chloride ions are extremely mobile in the soil and are readily transported by percolating water to aquifers.
 
As with all stormwater infiltration practices, risk of groundwater contamination from infiltration of runoff laden with road de-icing salt constituents (typically sodium and chloride) is a significant concern. Chloride ions are extremely mobile in the soil and are readily transported by percolating water to aquifers.
   Line 86: Line 86:  
Construction of permeable pavement is a specialized project and should involve experienced contractors. The following general recommendations apply:  
 
Construction of permeable pavement is a specialized project and should involve experienced contractors. The following general recommendations apply:  
 
*'''Sediment Control''': The treatment area should be fully protected during construction so that no sediment reaches the permeable pavement system and proper erosion and sediment controls must be maintained on site.  
 
*'''Sediment Control''': The treatment area should be fully protected during construction so that no sediment reaches the permeable pavement system and proper erosion and sediment controls must be maintained on site.  
*'''Weather''': Porous asphalt and pervious concrete will not properly pour and set in extremely high and low temperatures <ref>City of Portland. 2004. Portland Stormwater Management Manual. Prepared by the Bureau of Environmental Services (BES). Portland, OR.</ref>.  One benefit to using permeable pavers is that their installation is not weather dependent.  
+
*'''Weather''': Porous asphalt and pervious concrete will not properly pour and set in extremely high or low temperatures <ref>City of Portland. 2004. Portland Stormwater Management Manual. Prepared by the Bureau of Environmental Services (BES). Portland, OR.</ref>.  One benefit to using permeable pavers is that their installation is not weather dependent.  
 
*'''Pavement placement''': Properly installed permeable pavement requires trained and experienced producers and construction contractors.
 
*'''Pavement placement''': Properly installed permeable pavement requires trained and experienced producers and construction contractors.
    
==Inspection and Maintenance==
 
==Inspection and Maintenance==
Permeable pavements require regular inspection and maintenance to ensure that it functions properly. The limiting factor for permeable pavers is clogging within the aggregate layers, filler, or underdrain. Ideally, signs should be posted on the site identifying permeable paver and porous pavement areas. This can also serve as a public awareness and education opportunity. See: [[Permeable paving: Maintenance]]
+
Permeable pavements require regular inspection and maintenance to ensure proper functioning. The limiting factor for permeable pavers is clogging within the aggregate layers, filler, or underdrain. Ideally, signs should be posted on the site identifying permeable paver and porous pavement areas. This can also serve as a public awareness and education opportunity. See: [[Permeable paving: Maintenance]]
    
==Life Cycle Costs==
 
==Life Cycle Costs==
Initial construction costs for permeable pavements are typically higher than conventional asphalt pavement surfaces, largely due to thicker aggregate base needed for stormwater storage. However, the cost difference is reduced or eliminated when total life-cycle costs, or the total cost to construct and maintain the pavement over its lifespan, are considered. Other savings and benefits may also be realized, including reduced need for storm sewer pipes and other stormwater practices, less developable land consumed for stormwater treatment, and ancillary benefits such as improved aesthetics and reduced urban heat island effect. These systems are especially cost effective in existing urban development where parking lot expansion is needed, but there is not sufficient space for other types of BMPs. They combine parking, stormwater infiltration, retention, and detention into one facility.
+
Initial construction costs for permeable pavements are typically higher than conventional asphalt pavement surfaces, largely due to thicker aggregate base needed for stormwater storage. However, the cost difference is reduced or eliminated when total life-cycle costs, or the total cost to construct and maintain the pavement over its lifespan, are considered. Other potential savings and benefits include reduced need for storm sewer pipes and other stormwater practices, less developable land consumed for stormwater treatment, and ancillary benefits (improved aesthetics and reduced urban heat island effect). These systems are especially cost effective in existing urban development where parking lot expansion is needed, but there is not sufficient space for other types of BMPs. They combine parking, stormwater infiltration, retention, and detention into one facility.
    
<h2>Incentives and Credits <ref>http://www7.mississauga.ca/Departments/Marketing/stormwater/stormwater-charge/img/stormwater-credits-manual-0.1.pdf</ref></h2>
 
<h2>Incentives and Credits <ref>http://www7.mississauga.ca/Departments/Marketing/stormwater/stormwater-charge/img/stormwater-credits-manual-0.1.pdf</ref></h2>
390

edits

Navigation menu