The previous sections presented the most common options based on road and construction types. The project team must use the information gathered through the background review [[Site conditions road rights of way|background review and field reconnaissance]], feedback gained from the public engagement, as well as from the LID practice Suitability & Considerations Comparison Table [[Link]] to determine the feasible and optimal LID options for the site. Below is a list of factors to be considered when choosing the type of practice and how it will be incorporated into the site:
+
The previous sections presented the most common options based on road and construction types. The project team must use the information gathered through the [[Site conditions road right of ways|background review and field reconnaissance]], feedback gained from the public engagement, as well as from the LID practice Suitability & Considerations Comparison Table [[Link]] to determine the feasible and optimal LID options for the site. Below is a list of factors to be considered when choosing the type of practice and how it will be incorporated into the site:
    
'''Relevant stormwater criteria –''' compliance with high level municipal and agency documents (i.e. Subwatershed study, master drainage plan).
 
'''Relevant stormwater criteria –''' compliance with high level municipal and agency documents (i.e. Subwatershed study, master drainage plan).