Changes

Jump to navigation Jump to search
m
no edit summary
Line 7: Line 7:  
*Light industrial
 
*Light industrial
 
*Institutional
 
*Institutional
 
+
{{TOClimit|2}}
 
If the listed site features do not unanimously apply to your site, select the most appropriate category or use a combination of two or more categories to screen LID options. Please note that LID practices are scalable and applying alternate LID practices to those identified for each land use group may be a possibility upon a more detailed evaluation of site constraints (i.e. field testing conducted during pre-design). Choosing an appropriate LID practice can be an iterative process as additional site information becomes available in the predesign phase.
 
If the listed site features do not unanimously apply to your site, select the most appropriate category or use a combination of two or more categories to screen LID options. Please note that LID practices are scalable and applying alternate LID practices to those identified for each land use group may be a possibility upon a more detailed evaluation of site constraints (i.e. field testing conducted during pre-design). Choosing an appropriate LID practice can be an iterative process as additional site information becomes available in the predesign phase.
  
8,255

edits

Navigation menu