Changes

Jump to navigation Jump to search
m
no edit summary
Line 1: Line 1: −
{{Clickable button|[[File:TTT.png|400 px|link=http://www.sustainabletechnologies.ca/wp/low-impact-development-treatment-train-tool/]]}}
+
{{Clickable button|[[File:TTT.png|450 px|link=http://www.sustainabletechnologies.ca/wp/low-impact-development-treatment-train-tool/]]}}
 
[[File:LID TTT.png|thumb|[[Bioretention cells]] are found within the LID toolbox]]
 
[[File:LID TTT.png|thumb|[[Bioretention cells]] are found within the LID toolbox]]
 
{|class="wikitable"
 
{|class="wikitable"
 
|-
 
|-
!colspan = "2" style="background: darkcyan; color: white; align = center"|Surface
+
!colspan = "2" align = center"|Surface
 
|-
 
|-
 
|width = 210px|Berm height (mm)
 
|width = 210px|Berm height (mm)
Line 69: Line 69:  
|This is the height from the base of the cell to the height at which the drain discharges. In some designs this may be the height of the perforated pipe within the storage layer; in others this height is adjusted by creating an upturn in the discharge pipe.[[Bioretention: Partial infiltration]]
 
|This is the height from the base of the cell to the height at which the drain discharges. In some designs this may be the height of the perforated pipe within the storage layer; in others this height is adjusted by creating an upturn in the discharge pipe.[[Bioretention: Partial infiltration]]
 
|}
 
|}
<references/>
+
 
 
[[category: modeling]]
 
[[category: modeling]]
8,255

edits

Navigation menu