Changes

Jump to navigation Jump to search
m
no edit summary
Line 11: Line 11:  
* Void ratio = 14% - 31%
 
* Void ratio = 14% - 31%
 
* Permeability = 900 - 21,500 mm/hr
 
* Permeability = 900 - 21,500 mm/hr
|Thickness will range from 100 mm-150 mm depending on the expected loads
+
|Thickness will range from 100 mm - 150 mm depending on the expected loads
 
|-
 
|-
 
|'''Porous Asphalt'''
 
|'''Porous Asphalt'''
 
|
 
|
* open-graded asphalt mix with a minimum of 16% air voids  
+
* open-graded asphalt mix with a minimum of 16 % air voids  
 
* Polymer can be added to provide additional strength to heavy loads
 
* Polymer can be added to provide additional strength to heavy loads
|Thickness will range from 50 mm-100 mm depending on the expected loads
+
|Thickness will range from 50 mm - 100 mm depending on the expected loads
 
|-
 
|-
 
|'''Permeable Pavers'''
 
|'''Permeable Pavers'''
8,255

edits

Navigation menu