The equation for the depth of the stone bed is as follows:
The equation for the depth of the stone bed is as follows:
−
<math>d= \frac{[Q_c\times R + P - q\times T ]}{Vr}</math>
+
<math>d= \frac{[Q_c\times R + P - q'\times t ]}{V_{R}}</math>
{{Plainlist|1=Where:
{{Plainlist|1=Where:
*''d'' = Stone bed depth (m)
*''d'' = Stone bed depth (m)
Line 10:
Line 10:
*''R'' = A<sub>c</sub>/A<sub>p</sub>; the ratio of contributing drainage area (''A<sub>c</sub>'') to permeable paving area (''A<sub>p</sub>''). Note that the contributing drainage area (''A<sub>c</sub>'') should not contain pervious areas.
*''R'' = A<sub>c</sub>/A<sub>p</sub>; the ratio of contributing drainage area (''A<sub>c</sub>'') to permeable paving area (''A<sub>p</sub>''). Note that the contributing drainage area (''A<sub>c</sub>'') should not contain pervious areas.
*''P'' = Rainfall depth (m)
*''P'' = Rainfall depth (m)
−
*''q'' = Infiltration rate for native soils (m/day)
+
*''q''' = Infiltration rate for native soils (m/day)
−
*''T'' = Time to fill stone bed (typically 2 hr)
+
*''t'' = Time to fill stone bed (typically 2 hr)
−
*''Vr'' = Void ratio for stone bed (typically 0.35 for 50 mm dia. stone)}}
+
*''V<sub>R</sub>'' = Void ratio for stone bed (typically 0.35 for 50 mm dia. stone)}}
----
----
For designs that include an underdrain, the maximum depth of the stone reservoir below the invert of the underdrain pipe can be calculated as follows:
For designs that include an underdrain, the maximum depth of the stone reservoir below the invert of the underdrain pipe can be calculated as follows:
−
<math>dr_{max} = \frac{q \times t}{Vr}</math>
+
<math>d_{max} = \frac{q' \times t}{Vr}</math>
{{Plainlist|1=Where:
{{Plainlist|1=Where:
−
*''dr<sub>max</sub>'' = Maximum stone reservoir depth (m)
+
*''d<sub>max</sub>'' = Stone reservoir depth (m)
−
*''q'' = Infiltration rate for native soils (m/hr)
+
*''q''' = Infiltration coefficient for native soils (m/hr)
−
*''Vr'' = Void space ratio for aggregate used (typically 0.35 for 50 mm clear stone)
+
*''V<sub>R</sub>'' = Void space ratio for aggregate used (typically 0.35 for 50 mm clear stone)
*''t'' = Time to drain (design for 48 hour time to drain is recommended)}}