Changes

Jump to navigation Jump to search
Line 34: Line 34:     
<h3>Pretreatment</h3>
 
<h3>Pretreatment</h3>
In most designs, the surface acts as pretreatment to the stone reservoir below. Periodic vacuum sweeping and preventative measures like not storing snow or other materials on the pavement are critical to prevent clogging.
+
In most designs, the surface acts as pretreatment to the stone reservoir below. Periodic vacuum sweeping and preventative measures like not storing snow or other materials on the pavement are critical to prevent clogging. Another pretreatment element is a pea gravel choking layer above the coarse gravel storage reservoir.
    
<h3>Landscaping</h3>
 
<h3>Landscaping</h3>

Navigation menu