Line 31:
Line 31:
*Minimum length 30 m
*Minimum length 30 m
−
{|class="wikitable"
+
−
|+ Slope variations
+
−
|-
+
−
|< 2 %||Use underdrain to distribute water for infiltration
+
===Adding check dams===
−
|-
+
To calculate the spaing and sizing of check dams, see [[Check dams: Sizing]]
−
|2 - 5 %||Design swale for surface flow, consider check dams
+
−
|-
+
−
||5 %||Check dams required to reduce effective slope to 2 – 3 %
+
−
|}
Maximum depth of flow
Maximum depth of flow