Runoff volume and peak flow reductions were calculated.
+
Runoff volume and peak flow reductions were calculated:
===Peak Flow===
===Peak Flow===
Line 38:
Line 38:
This shows that LID will not reduce significantly the post-development peak flows generated from major storms.
This shows that LID will not reduce significantly the post-development peak flows generated from major storms.
−
In order to meet flood control requirements, LID need to be augmented by some flood storage measures such as dry/park ponds, underground storage.
+
In order to meet flood control requirements, LID need to be augmented by some flood storage measures such as [[dry ponds]] or [[infiltration chambers|underground storage]].