Changes

Jump to navigation Jump to search
Line 37: Line 37:  
== Screen Potential LID Options ==
 
== Screen Potential LID Options ==
   −
A number of factors need to be considered when screening the suitability of a given location within a development site for application of stormwater BMPs. [[LID Site Criteria and Constraints]] summarizes site constraints associated with some general types of structural LID practices for stormwater management that should be considered. Further information regarding constraints to the design of various end-of-pipe BMPs can be found in the Ontario Ministry of the Environment Stormwater Management Planning and Design Manual (2003). The use of LID BMPs should be considered first to meet the design criteria before the use of end-of-pipe BMPs. Other considerations for screening potential LID options is detailed below.
+
=== Site Constraints ===
 +
 
 +
A number of factors need to be considered when screening the suitability of a given location within a development site for application of stormwater BMPs. [[LID Site Criteria and Constraints]] summarizes site constraints associated with some general types of structural LID practices for stormwater management that should be considered. Further information regarding constraints to the design of various end-of-pipe BMPs can be found in the Ontario Ministry of the Environment Stormwater Management Planning and Design Manual (2003). The use of LID BMPs should be considered first to meet the design criteria before the use of end-of-pipe BMPs.  
 +
 
 +
If working in a retrofit scenarios, land use type  in particular will have various constraints to work with. Road ROWs, industrial, commercial, institutional, residential, and park lands all have unique site constraints and corresponding LID opportunities. To help understand these unique land type constraint and potential LID options, see
 +
 
 +
*LID Opportunities and Road Types
 +
 
 +
*LID Opportunities and Mult-Residential Types
 +
 
 +
*LID Opportunities and Industrial & Commercial Types
 +
 
 +
*LID Opportunities and Institutional Types
 +
 
 +
*LID Opportunities and Park Lands 
    
=== Performance Requirements ===
 
=== Performance Requirements ===
   −
Resources on LID performance studies are widely available. Performance of LID within Ontario can be found on [http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/ the Sustainable Technologies Evaluation Program] and [http://www.creditvalleyca.ca/low-impact-development/lid-maintenance-monitoring/lid-monitoring-sites/ Credit Valley Conservation's LID Monitoring program]. To garner a global perspective of LID performance across various geographical regions, check out the [http://www.bmpdatabase.org/index.htm International Stormwater BMP Database], performance data can be downloaded and statistical analysis tools are provided.  
+
Resources on LID performance studies are widely available. Performance of LID within Ontario can be found on [http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/ the Sustainable Technologies Evaluation Program] and [http://www.creditvalleyca.ca/low-impact-development/lid-maintenance-monitoring/lid-monitoring-sites/ Credit Valley Conservation's LID Monitoring program]. To garner a global perspective of LID performance across various geographical regions, check out the [http://www.bmpdatabase.org/index.htm International Stormwater BMP Database], performance data can be downloaded or uploaded and statistical analysis tools are provided.  
    
=== Operations and Maintenance Requirements ===
 
=== Operations and Maintenance Requirements ===