Changes

Jump to navigation Jump to search
Line 58: Line 58:     
Design Manual (2003). The use of LID BMPs should be considered first to meet the design criteria before the use of end-of-pipe BMPs. Other considerations for screening potential LID options is detailed below.
 
Design Manual (2003). The use of LID BMPs should be considered first to meet the design criteria before the use of end-of-pipe BMPs. Other considerations for screening potential LID options is detailed below.
        Line 65: Line 64:  
Resources on LID performance studies are widely available. Performance of LID within Ontario can be found on  
 
Resources on LID performance studies are widely available. Performance of LID within Ontario can be found on  
   −
[http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/ the Sustainable Technologies Evaluation Program] and on
+
[http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/ the Sustainable Technologies Evaluation Program] and
    
[http://www.creditvalleyca.ca/low-impact-development/lid-maintenance-monitoring/lid-monitoring-sites/ Credit Valley Conservation's LID Monitoring program]. To garner a global perspective of LID performance across various  
 
[http://www.creditvalleyca.ca/low-impact-development/lid-maintenance-monitoring/lid-monitoring-sites/ Credit Valley Conservation's LID Monitoring program]. To garner a global perspective of LID performance across various  
   −
geographical regions, check out the [http://www.bmpdatabase.org/index.htm International Stormwater BMP Database], data can be downloaded and statistical analysis tools are provided.  
+
geographical regions, check out the [http://www.bmpdatabase.org/index.htm International Stormwater BMP Database], performance data can be downloaded and statistical analysis tools are provided.  
    
=== Operations and Maintenance Requirements ===
 
=== Operations and Maintenance Requirements ===
147

edits

Navigation menu