Line 53: Line 53:  
!|5:1 to 10:1||Not applicable||1 to 3||5 to 15||0.5 to 6||No||4m- Building Foundation<br>Underground Utilities||1 m||None
 
!|5:1 to 10:1||Not applicable||1 to 3||5 to 15||0.5 to 6||No||4m- Building Foundation<br>Underground Utilities||1 m||None
 
|-
 
|-
!Dry Swale
+
!Dry Swale (Bioswale)
 
!1
 
!1
 
!|5:1 to 15:1||Underdrain Required <br> if < 15 mm/hr||1 to 3||5 to 10||0.5 to 6||No||4m (3m if impermeable liner<br>is used)Building foundation,<br> Underground utilities, drinking<br>water wellhead protection areas||1 m||2 Yr
 
!|5:1 to 15:1||Underdrain Required <br> if < 15 mm/hr||1 to 3||5 to 10||0.5 to 6||No||4m (3m if impermeable liner<br>is used)Building foundation,<br> Underground utilities, drinking<br>water wellhead protection areas||1 m||2 Yr