Changes

Jump to navigation Jump to search
Line 15: Line 15:     
===Extend drainage flow paths===
 
===Extend drainage flow paths===
Slowing down flows and lengthening flow paths allow more opportunities for stormwater to be filtered and infiltrated. Extending the travel time can also delay and lower peak flows.  Where suitable, flows should be conveyed using vegetated open channels (see [[Enhanced grass swale]] and [[Bioswales]]).
+
Slowing down flows and lengthening flow paths allow more opportunities for stormwater to be filtered and infiltrated. Extending the travel time can also delay and lower peak flows.  Where suitable, flows should be conveyed using vegetated open channels (see [[Enhanced grass swales]] and [[Bioswales]]).
    
==References==
 
==References==
 
<references/>
 
<references/>
 
[[category:planning]]
 
[[category:planning]]
8,255

edits

Navigation menu