=== Assess Effectiveness ===
 
=== Assess Effectiveness ===
 +
 +
Once the suite of best management practices have been selected and the models have
 +
 +
been run, a comparison of the results and the environmental design criteria can be
 +
 +
made. An iterative approach, which involves adjusting the size or adding/deleting BMPs
 +
 +
should be used until the environmental design criteria are met. The project can then
 +
 +
proceed to the detailed design stage.
    
=== Meets Design Criteria ===
 
=== Meets Design Criteria ===
    
=== Proceed to Detailed Design ===
 
=== Proceed to Detailed Design ===