Changes

Jump to navigation Jump to search
Line 29: Line 29:  
* Natural Heritage Systems or green infrastructure
 
* Natural Heritage Systems or green infrastructure
   −
=== Screen LID Options ===
+
=== Screen Potential LID Options ===
 +
 
 +
A number of factors need to be considered when screening the suitability of a given
 +
 
 +
location within a development site for application of stormwater BMPs. Table 3.4.1
 +
 
 +
summarizes site constraints associated with some general types of structural LID
 +
 
 +
practices for stormwater management that should be considered. Further
 +
 
 +
information regarding constraints to the design of various end-of-pipe BMPs can be
 +
 
 +
found in the Ontario Ministry of the Environment Stormwater Management Planning and
 +
 
 +
Design Manual (2003). The use of LID BMPs should be considered first to meet the
 +
 
 +
design criteria before the use of end-of-pipe BMPs.
 +
 
    
==== Structural Requirements or Site Constraints ====
 
==== Structural Requirements or Site Constraints ====
147

edits

Navigation menu