Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
Screening LID options
(view source)
Revision as of 20:00, 12 September 2017
638 bytes added
,
7 years ago
→Screen LID Options
Line 29:
Line 29:
* Natural Heritage Systems or green infrastructure
* Natural Heritage Systems or green infrastructure
−
=== Screen LID Options ===
+
=== Screen
Potential
LID Options ===
+
+
A number of factors need to be considered when screening the suitability of a given
+
+
location within a development site for application of stormwater BMPs. Table 3.4.1
+
+
summarizes site constraints associated with some general types of structural LID
+
+
practices for stormwater management that should be considered. Further
+
+
information regarding constraints to the design of various end-of-pipe BMPs can be
+
+
found in the Ontario Ministry of the Environment Stormwater Management Planning and
+
+
Design Manual (2003). The use of LID BMPs should be considered first to meet the
+
+
design criteria before the use of end-of-pipe BMPs.
+
==== Structural Requirements or Site Constraints ====
==== Structural Requirements or Site Constraints ====
KyleVDL
147
edits
Navigation menu
Personal tools
English
Log in
Namespaces
Page
Discussion
Variants
Views
Read
View source
View history
More
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version