Changes

Jump to navigation Jump to search
Line 96: Line 96:  
*Full Infiltration: Full infiltration designs are more effective because little if any of the pollutants generated on the impermeable surfaces leave the site as surface runoff.
 
*Full Infiltration: Full infiltration designs are more effective because little if any of the pollutants generated on the impermeable surfaces leave the site as surface runoff.
 
*Partial Infiltration: Partial infiltration designs with underdrains generate more runoff.
 
*Partial Infiltration: Partial infiltration designs with underdrains generate more runoff.
Studies in North Carolina have shown the average curve number of permeable pavements to range from a low of 45 to a high of 89 <ref>Bean, E.Z., Hunt, W, F., Bidelspach, D.A. 2007a. Evaluation of Four Permeable Pavement Sites in Eastern North Carolina for Runoff Reduction and Water Quality Impacts. Journal of Irrigation and Drainage Engineering. Vol. 133. No. 6. pp. 583-592.</ref>
+
Studies in North Carolina have shown the average curve number of permeable pavements to range from a low of 45 to a high of 89. <ref>Bean, E.Z., Hunt, W, F., Bidelspach, D.A. 2007a. Evaluation of Four Permeable Pavement Sites in Eastern North Carolina for Runoff Reduction and Water Quality Impacts. Journal of Irrigation and Drainage Engineering. Vol. 133. No. 6. pp. 583-592.</ref>
    
==Construction Considerations==
 
==Construction Considerations==

Navigation menu