Changes

Jump to navigation Jump to search
no edit summary
Line 14: Line 14:  
|style="width:30px"| 
 
|style="width:30px"| 
 
|Gravel for the underdrain should be clean and washed; no fines should be present in the material
 
|Gravel for the underdrain should be clean and washed; no fines should be present in the material
 +
|-
 
||
 
||
 
|Underdrain pipe material should be perforated and of the correct size (when specified in design)
 
|Underdrain pipe material should be perforated and of the correct size (when specified in design)
 +
|-
 
||
 
||
 
|A cap should be placed on the upstream (but not the downstream) end of the underdrain (when specified in design)
 
|A cap should be placed on the upstream (but not the downstream) end of the underdrain (when specified in design)
 +
|-
 
||
 
||
 
|Biomedia should be tested to confirm that it meets specifications
 
|Biomedia should be tested to confirm that it meets specifications
 +
|-
 
||
 
||
 
|Mulch composition should be correct
 
|Mulch composition should be correct
8,255

edits

Navigation menu