Changes

Jump to navigation Jump to search
no edit summary
Line 5: Line 5:  
#The ''maximum'' total depth may be limited by the [[Infiltration| conditions underground]] e.g. the groundwater or underlying geology/infrastructure.
 
#The ''maximum'' total depth may be limited by the [[Infiltration| conditions underground]] e.g. the groundwater or underlying geology/infrastructure.
 
#The minimum total depth may be limited by the need to support vegetation i.e. not < 0.6 m.
 
#The minimum total depth may be limited by the need to support vegetation i.e. not < 0.6 m.
#The area P for a [[green roofs]], [[absorbent landscapes]] and [[permeable paving]] may be very similar or equal to the catchment area, so that the I/P ratio is close to 1.
+
#[[Green roofs]], [[absorbent landscapes]] and [[permeable paving]] often receive very little flow from other surfaces, so that the I/P ratio is close to 1.
 
#[[Infiltration trenches]], [[Infiltration chambers| chambers]] and [[bioretention cells]] have a maximum recommended I/P ratio of 20.
 
#[[Infiltration trenches]], [[Infiltration chambers| chambers]] and [[bioretention cells]] have a maximum recommended I/P ratio of 20.
  
8,255

edits

Navigation menu