|Infiltration trench||Two growing seasons||Silty clay||10:1||<10 cm; flow rate control||80%
+
|Infiltration trench<ref>Van Seters, T. and Young, D., 2015, Performance Comparison of Surface and Underground Stormwater Infiltration Practices, TRCA, Toronto, Ontario</ref>||Two growing seasons||Silty clay||10:1||<10 cm; flow rate control||80%
 
|-
 
|-
|Bioretention||Two growing seasons||Silty clay||10:1||<10 cm; flow rate control||90%
+
|Bioretention<ref>Van Seters, T. and Young, D., 2015, Performance Comparison of Surface and Underground Stormwater Infiltration Practices, TRCA, Toronto, Ontario</ref>||Two growing seasons||Silty clay||10:1||<10 cm; flow rate control||90%
 
|-
 
|-
|Permeable Pavement||Five growing seasons||Silty clay||1:1||<10 cm; flow rate control||45%
+
|Permeable Pavement<ref>Van Seters, T. and Drake, J. Five year evaluation of Permeable Pavements, TRCA, Toronto, Ontario</ref>||Five growing seasons||Silty clay||1:1||<10 cm; flow rate control||45%
 
|-
 
|-
 
|Bioretention||One growing season||Silty clay||10:1||<10 cm; flow rate control||83%
 
|Bioretention||One growing season||Silty clay||10:1||<10 cm; flow rate control||83%
Line 78: Line 78:  
|Permeable pavement||Four years||Silty clay fill over clay till||1:1||?||?
 
|Permeable pavement||Four years||Silty clay fill over clay till||1:1||?||?
 
|}
 
|}
|*Represents depth of sump below underdrain or outflow pipe.  In some cases, a flow control device was installed to slow outflow rates and enhance infiltration
+
<nowiki>*</nowiki>Represents depth of sump below underdrain or outflow pipe.  In some cases, a flow control device was installed to slow outflow rates and enhance infiltration
 
2. Also known as the Etobicoke Exfiltration system
 
2. Also known as the Etobicoke Exfiltration system
   −
 
+
==References==
References:
+
<references/>
 
  −
 
  −
Young, D., Van Seters, T., Graham, C. 2013 Evaluation of Underground Stormwater Infiltration Systems, TRCA, Toronto, Ontario
  −
Van Seters, T. and Young, D., 2015, Performance Comparison of Surface and Underground Stormwater Infiltration Practices, TRCA, Toronto, Ontario
  −
Van Seters T and Graham C, 2014, Performance Evaluation of a Bioretention System, TRCA, Toronto, Ontario
  −
SNAP studies of residential rain gardens (need to find reference)
  −
Van Seters, T. and Drake, J. Five year evaluation of Permeable Pavements, TRCA, Toronto, Ontario
  −
STEP, Performance evaluation of Permeable Pavements – tech brief
  −
Calstone report – need to find reference
  −
Young D, Van Seters T, Graham, C, 2013, Evaluation of Residential Lot Level Stormwater Practices – tech brief
  −
SWAMP, 2005.  Performance Assessment of a Perforated Pipe Stormwater Exfiltration system, Toronto, Ontario, TRCA, Toronto, Ontario
  −
SWAMP, 2002, Performance Assessment of a Swale Perforated Pipe Stormwater Infiltration System, TRCA, Toronto Ontario
  −