Changes

Jump to navigation Jump to search
Line 22: Line 22:  
----
 
----
 
===Planning Considerations===
 
===Planning Considerations===
 +
<p>Both modular systems require a lower bedding layer of angular stone to permit infiltration, and provide a foundation for the installation:
 +
*Plastic modules usually have a parabolic shape to resist the load above. The spaces between the rows of the gallery are then filled with more clear stone to support the overlying infrastructure.
 +
*Concrete modules are often box shaped and can, in some circumstances, be employed without any additional cover. However, a minimum of 20 cm cover is for most applications. Where this cover is (irrigated) topsoil this can support turf grass. Deeper soil is required to support more complex plants.
 +
----
    
===Design===
 
===Design===
8,255

edits

Navigation menu