TRCA conducted [[modeling]] to evaluate the capacity of different stormwater management measures (LID and Ponds) to mitigate impacts of development on the peak flow and runoff volume. A sub-catchment in Humber River was selected that has an area of 35.7 ha. The existing land use in the sub-catchment is agriculture and the proposed future land use is employment land with 91% total imperviousness. | TRCA conducted [[modeling]] to evaluate the capacity of different stormwater management measures (LID and Ponds) to mitigate impacts of development on the peak flow and runoff volume. A sub-catchment in Humber River was selected that has an area of 35.7 ha. The existing land use in the sub-catchment is agriculture and the proposed future land use is employment land with 91% total imperviousness. |