An ESC plan should include drawings, standard notes and reports depicting and describing the site conditions (e.g. grades, locations of natural features, soil stockpiles and other key points of interest) during each phase of construction, and the BMPs that will be
+
An ESC plan should include drawings, standard notes and reports depicting and describing the site conditions (e.g. [[grading|grades]], locations of natural features, [[soil]] stockpiles and other key points of interest) during each phase of construction, and the BMPs that will be
 
applied to mitigate erosion and sediment transport.
 