Changes

Jump to navigation Jump to search
Line 414: Line 414:  
*During or immediately following any spill event  
 
*During or immediately following any spill event  
 
*Before construction is shut down for the winter to ensure the site is ready for freezing conditions and thaws  
 
*Before construction is shut down for the winter to ensure the site is ready for freezing conditions and thaws  
*At the end of construction to confirm that the site has achieved at least 80% stabilization (CSA, 2018) and that permanent vegetation areas are well-established and effectively preventing erosion}}
+
*At the end of construction to confirm that the site has achieved at least 80% stabilization and that permanent vegetation areas are well-established and effectively preventing erosion}}
    
<div style="display:flex; justify-content:center; gap:20px; flex-wrap:wrap;">
 
<div style="display:flex; justify-content:center; gap:20px; flex-wrap:wrap;">

Navigation menu