==Performance Monitoring==
 
==Performance Monitoring==
 +
[[File:Screenshot 2025-11-05 155529.png|400px|thumb|right|Map showing an example construction site with two pond discharges and an upstream and downstream monitoring site.]]
 
[[File:Screenshot 2025-11-05 155737.png|300px|thumb|right|An in-water turbidity monitoring station.]]
 
[[File:Screenshot 2025-11-05 155737.png|300px|thumb|right|An in-water turbidity monitoring station.]]
   Line 461: Line 462:  
*One continuous online turbidity monitoring station 5 to 15 m downstream of the last site discharge point.  
 
*One continuous online turbidity monitoring station 5 to 15 m downstream of the last site discharge point.  
 
*At least one continuous online turbidity monitoring station immediately upstream of the site.
 
*At least one continuous online turbidity monitoring station immediately upstream of the site.
  −
[[File:Screenshot 2025-11-05 155529.png|400px|thumb|right|Map showing an example construction site with two pond discharges and an upstream and downstream monitoring site.]]
      
Each turbidity monitoring station should be equipped with a turbidity sonde, data logger, power supply, protective enclosure, and, where Species at Risk (SAR) are present, telemetry capabilities. Continuous turbidity monitoring should be maintained until the site has reached at least 80% effective permanent stabilization. Where continuous monitoring is not feasible, grab samples should be collected. To support interpretation of turbidity exceedances, precipitation data should be obtained from a rain gauge located within 5 km of the site. Clear protocols for responding to and reporting turbidity exceedances should be established for all sites with continuous monitoring.
 
Each turbidity monitoring station should be equipped with a turbidity sonde, data logger, power supply, protective enclosure, and, where Species at Risk (SAR) are present, telemetry capabilities. Continuous turbidity monitoring should be maintained until the site has reached at least 80% effective permanent stabilization. Where continuous monitoring is not feasible, grab samples should be collected. To support interpretation of turbidity exceedances, precipitation data should be obtained from a rain gauge located within 5 km of the site. Clear protocols for responding to and reporting turbidity exceedances should be established for all sites with continuous monitoring.