Changes

Jump to navigation Jump to search
Line 399: Line 399:  
{| class="wikitable"
 
{| class="wikitable"
 
|+Table 3: Maximum allowable construction-based turbidity increases in the receiving water system at different durations
 
|+Table 3: Maximum allowable construction-based turbidity increases in the receiving water system at different durations
! style="width: 50%;|"Construction-based turbidity increase (NTU)
+
! style="width: 50%;|Construction-based turbidity increase (NTU)
! style="width: 50%;|"Duration (h)
+
! style="width: 50%;|Duration (h)
 
|-
 
|-
 
| 761
 
| 761

Navigation menu