Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1: −
<gallery mode="packed" widths=300px heights=200px>
+
<gallery mode="packed" heights=250px>
|Keep LID perimeter controls in working order throughout construction.  
+
ESC premature removal.jpg|Keep LID perimeter controls in working order throughout construction. ESC measures at this bioretention feature were removed before construction in its drainage was complete, allowing sediment into it (Photo Source: CVC).
 
Screenshot 2025-11-12 114624.png|Protect LID inlets.
 
Screenshot 2025-11-12 114624.png|Protect LID inlets.
 
Screenshot 2025-11-12 114809.png|Avoid heavy equipment on infiltration areas (i.e., driving vehicles through filter beds, or over granular water storage and bedding layers). Identify and mark LID areas to increase awareness.
 
Screenshot 2025-11-12 114809.png|Avoid heavy equipment on infiltration areas (i.e., driving vehicles through filter beds, or over granular water storage and bedding layers). Identify and mark LID areas to increase awareness.

Navigation menu