An ESC plan should be created based on a given site’s ERA, with more controls used in the higher risk areas. An ESC plan should be designed for each stage of construction:
+
An ESC plan should be created based on a given site’s ERA, with more controls used in the higher risk areas.
−
{{textbox|#[[Topsoil]] stripping, [[Excavation and grading|grading]], and stabilization
+
{{textbox|An ESC plan should be designed for each stage of construction:
+
#[[Topsoil]] stripping, [[Excavation and grading|grading]], and stabilization