==ESC plan design==
 
==ESC plan design==
 
An ESC plan should be created based on a given site’s ERA, with more controls used in the higher risk areas. An ESC plan should be designed for each stage of construction:  
 
An ESC plan should be created based on a given site’s ERA, with more controls used in the higher risk areas. An ESC plan should be designed for each stage of construction:  
{{textbox|#[[Topsoil]] stripping, [[Excavation and Grading|grading]], and stabilization
+
{{textbox|#[[Topsoil]] stripping, [[grading|Excavation and grading]], and stabilization
 
#Servicing  
 
#Servicing  
 
#Building [[construction]]
 
#Building [[construction]]