Changes

Jump to navigation Jump to search
Line 339: Line 339:  
This progressive approach ensures that ESC strategies evolve alongside the project’s design and that regulatory requirements are addressed at each stage. The permits and approvals required for an urban construction project are dictated by relevant legislation as well as project and site-specific circumstances. Early consultation with regulatory agencies is encouraged in order to allow time for any necessary permits and approvals to be issued. Refer to Chapters 8 and 9 in the 2019 guide for full details on requirements for each planning stage and the approvals process.  
 
This progressive approach ensures that ESC strategies evolve alongside the project’s design and that regulatory requirements are addressed at each stage. The permits and approvals required for an urban construction project are dictated by relevant legislation as well as project and site-specific circumstances. Early consultation with regulatory agencies is encouraged in order to allow time for any necessary permits and approvals to be issued. Refer to Chapters 8 and 9 in the 2019 guide for full details on requirements for each planning stage and the approvals process.  
   −
For projects requiring a TRCA permit, information on the TRCA permitting process can be found [https://trca.ca/planning-permits/how-the-permit-process-works/ here]
+
For projects requiring a TRCA permit, information on the TRCA permitting process can be found [https://trca.ca/planning-permits/how-the-permit-process-works/ here].
   −
As PDF preview: ESC report contents and drawings checklists https://sustainabletechnologies.ca/app/uploads/2020/10/Submission-Checklist-2020.docx
+
ESC report contents and drawings checklists, created by TRCA in 2019, are available for download [https://sustainabletechnologies.ca/app/uploads/2020/10/Submission-Checklist-2020.docx here].
    
=Routine inspection=
 
=Routine inspection=

Navigation menu