Line 184: Line 184:  
#Final erosion control provided within the stormwater management facility, controlling release rates to maintain the existing condition erosion exceedance values.
 
#Final erosion control provided within the stormwater management facility, controlling release rates to maintain the existing condition erosion exceedance values.
 
#Final design required both LIDs to reduce the overall runoff volumes, but also sub-surface storage chambers to provide quantity control for rare storm events up to the 100-year design storm. Due to large area required for truck parking, limited opportunities for more landscaping to promote [[evapotranspiration]], runoff volumes increased beyond ability of LIDs to negate the need for quantity control.
 
#Final design required both LIDs to reduce the overall runoff volumes, but also sub-surface storage chambers to provide quantity control for rare storm events up to the 100-year design storm. Due to large area required for truck parking, limited opportunities for more landscaping to promote [[evapotranspiration]], runoff volumes increased beyond ability of LIDs to negate the need for quantity control.
 +
    
===Example 2. West Gormley, Town of Richmond Hill===
 
===Example 2. West Gormley, Town of Richmond Hill===
Line 198: Line 199:  
#Use a combination of increased topsoil depths, perforated storm sewers, stormwater management facility, and an infiltration facility to provide quality, quantity, and reduce runoff volumes to match pre-development.
 
#Use a combination of increased topsoil depths, perforated storm sewers, stormwater management facility, and an infiltration facility to provide quality, quantity, and reduce runoff volumes to match pre-development.
 
#Even with favorable soils and maximum use of infiltration techniques, site still requires quantity control storage for large storm events.
 
#Even with favorable soils and maximum use of infiltration techniques, site still requires quantity control storage for large storm events.
 +
    
===Example 3: 3775-4005 Dundas St West (includes 2-6 Humber Hill Ave), Toronto===
 
===Example 3: 3775-4005 Dundas St West (includes 2-6 Humber Hill Ave), Toronto===
Line 212: Line 214:  
#Final design required both LIDs to reduce the overall runoff volumes, but also sub-surface storage chambers to provide quantity control to meet municipal requirements.
 
#Final design required both LIDs to reduce the overall runoff volumes, but also sub-surface storage chambers to provide quantity control to meet municipal requirements.
 
#Due to underground parking limited opportunities for infiltration LIDs but used green roof to promote evapotranspiration, and cistern to reduce runoff volumes.
 
#Due to underground parking limited opportunities for infiltration LIDs but used green roof to promote evapotranspiration, and cistern to reduce runoff volumes.
 +
    
===Example 4: Honda Canada Head Office===
 
===Example 4: Honda Canada Head Office===