| Line 1: |
Line 1: |
| | [[File:TrilliumMECP.jpeg|right|frameless]] | | [[File:TrilliumMECP.jpeg|right|frameless]] |
| | ==Overview== | | ==Overview== |
| − | [[File:Screenshot 2025-09-11 103945.png|600px|thumb|right|Replacing individual Environmental Compliance Approvals with a single environmental permission for all the sewage works components of a municipal sewage collection system or a municipal stormwater management system (MECP & LSRCA, 2023)<ref name = S2S2023>MECP and LSRCA. 2023. Panel Presentation: Monitoring and the Consolidated Linear Infrastructure Environmental Compliance Approval (CLI-ECA) Framework: Understanding and Applying Ontario’s New Requirements for Municipal Stormwater Infrastructure. Source to Stream Conference. https://sourcetostream.com/2023-panel/</ref>.]] | + | [[File:Screenshot 2025-09-11 103945.png|600px|thumb|right|CLI-ECA replaces individual ECAs with a single environmental permission for all the sewage works components of a municipal sewage collection system or a municipal stormwater management system (MECP & LSRCA, 2023)<ref name = S2S2023>MECP and LSRCA. 2023. Panel Presentation: Monitoring and the Consolidated Linear Infrastructure Environmental Compliance Approval (CLI-ECA) Framework: Understanding and Applying Ontario’s New Requirements for Municipal Stormwater Infrastructure. Source to Stream Conference. https://sourcetostream.com/2023-panel/</ref>.]] |
| − | The [https://www.ontario.ca/page/municipal-consolidated-linear-infrastructure-environmental-compliance-approvals Municipal Consolidated Linear Infrastructure Environmental Compliance Approval (CLI-ECA)] is a streamlined approval process for municipalities managing wastewater, stormwater, and Low Impact Development (LID) infrastructure. MECP requires all municipalities in Ontario to enroll into the CLI-ECA program by application. Each municipality will receive: | + | The [https://www.ontario.ca/page/municipal-consolidated-linear-infrastructure-environmental-compliance-approvals Municipal Consolidated Linear Infrastructure Environmental Compliance Approval (CLI-ECA)] is a streamlined approval process for municipalities managing wastewater, stormwater, and Low Impact Development (LID) infrastructure. The CLI-ECA replaces the need for municipalities to apply for multiple, project-specific Environmental Compliance Approvals (ECAs) every time they want to make changes or additions to their water, wastewater, or stormwater collection systems. CLI-ECAs authorize municipalities to make changes to the system when requirements in the CLI-ECA are met (MECP, 2024)<ref name = mecp2024>MECP. 2024. https://www.ontario.ca/page/municipal-consolidated-linear-infrastructure-environmental-compliance-approvals</ref>. MECP requires all municipalities in Ontario to enroll into the CLI-ECA program by application. Each municipality will receive: |
| | *One CLI-ECA for their municipal sewage collection system | | *One CLI-ECA for their municipal sewage collection system |
| | *One CLI-ECA for their municipal stormwater management system (MECP, 2025)<ref name = S2S2025>MECP. 2025. Bringing the CLI-ECA Framework into Action: Guiding Principles to Inform Stormwater Management Practices. Source to Stream Conference Presentation. https://sourcetostream.com/app/uploads/2025/04/Day-2-Hall-A-Presentation-2-DSmith-AAhmed.pdf</ref> | | *One CLI-ECA for their municipal stormwater management system (MECP, 2025)<ref name = S2S2025>MECP. 2025. Bringing the CLI-ECA Framework into Action: Guiding Principles to Inform Stormwater Management Practices. Source to Stream Conference Presentation. https://sourcetostream.com/app/uploads/2025/04/Day-2-Hall-A-Presentation-2-DSmith-AAhmed.pdf</ref> |
| − |
| |
| − | CLI-ECAs authorize municipalities to make changes to the system when requirements in the CLI-ECA are met (MECP, 2024)<ref name = mecp2024>MECP. 2024. https://www.ontario.ca/page/municipal-consolidated-linear-infrastructure-environmental-compliance-approvals</ref>.
| |
| | | | |
| | ==Step-by-step compliance process== | | ==Step-by-step compliance process== |
| | [[File:Screenshot 2025-09-10 151234.png|400px|thumb|right|CLI-ECA flow chart (MECP, 2024)<ref name = mecp2024></ref>]] | | [[File:Screenshot 2025-09-10 151234.png|400px|thumb|right|CLI-ECA flow chart (MECP, 2024)<ref name = mecp2024></ref>]] |
| | ===Step 1: Determine if your project falls under CLI-ECA=== | | ===Step 1: Determine if your project falls under CLI-ECA=== |
| − | Identify whether the proposed wastewater or stormwater project qualifies as a pre-authorized alteration under CLI-ECA. Common eligible projects include:
| + | If you are a developer or prescribed person, contact the municipality where your project is located to determine if they have received a CLI-ECA and obtain a copy. You must then identify whether the proposed wastewater or stormwater project qualifies as a pre-authorized alteration under the CLI-ECA. Common eligible projects include: |
| | | | |
| | Stormwater: | | Stormwater: |
| Line 20: |
Line 18: |
| | Wastewater: | | Wastewater: |
| | *Sewage works used for the collection, storage, pumping, and transmission of sanitary sewage, excluding treatment | | *Sewage works used for the collection, storage, pumping, and transmission of sanitary sewage, excluding treatment |
| − | *All the eligible sewage works for collection of sanitary sewage that are owned by a municipality, or that may be transferred to a municipality pursuant to an agreement including pumping stations and pipes | + | *Municipal-owned eligible sewage works for collection of sanitary sewage |
| | *Combined sewers and combined sewage storage structures that collect and convey both wastewater from residential, commercial, institutional and industrial buildings and stormwater runoff through a single-pipe system | | *Combined sewers and combined sewage storage structures that collect and convey both wastewater from residential, commercial, institutional and industrial buildings and stormwater runoff through a single-pipe system |
| − | *Pumping stations including those that pre-condition sewage for further treatment downstream, such as the addition of coagulants, flocculants, disinfectants, or pH adjustment | + | *Pumping stations |
| − | *Sewage works used for the management of residue from the system or odour control | + | *Sewage works used for the management of residue or odour |
| | + | |
| | + | If you determine that your project falls under the CLI-ECA, refer to the municipality for guidance on how to submit an application. |
| | + | Works that do not qualify as a pre-authorized alteration under the CLI-ECA must instead go through a standalone, project-specific Environmental Compliance Approval (ECA) process |
| | | | |
| | ===Step 2: Review design criteria and standards=== | | ===Step 2: Review design criteria and standards=== |
| − | * Ensure project design follows [https://www.kitchener.ca/en/resourcesGeneral/Documents/INS_SSU_Design_Criteria.pdf MECP’s Design Criteria for Sanitary Sewers, Storm Sewers and Forcemains for Alterations Authorized under an Environmental Compliance Approval (2023)].
| + | Ensure project design and objectives follow: |
| − | * Incorporate stormwater treatment objectives from the [https://dr6j45jk9xcmk.cloudfront.net/documents/1757/195-stormwater-planning-and-design-en.pdf Ontario Stormwater Management Planning and Design Guidance Manual] (MOE, 2003)<ref>MOE. 2003.Ontario Stormwater Management Planning and Design Guidance Manual. https://dr6j45jk9xcmk.cloudfront.net/documents/1757/195-stormwater-planning-and-design-en.pdf</ref> and the [https://ero.ontario.ca/public/2022-01/Draft%20LID%20Stormwater%20Management%20Guidance%20Manual%202022.pdf Low Impact Development Stormwater Management Guidance Manual Draft] (MECP, 2022)<ref>MECP. 2022. Low Impact Development Stormwater Management Guidance Manual Draft. https://ero.ontario.ca/public/2022-01/Draft%20LID%20Stormwater%20Management%20Guidance%20Manual%202022.pdf</ref>. | + | *MECP's [https://www.kitchener.ca/en/resourcesGeneral/Documents/INS_SSU_Design_Criteria.pdf MECP’s Design Criteria for Sanitary Sewers, Storm Sewers and Forcemains for Alterations Authorized under an Environmental Compliance Approval (2023)]<ref>MECP. 2023. Design Criteria for Sanitary Sewers, Storm Sewers and Forcemains for Alterations Authorized under an Environmental Compliance Approval. https://www.kitchener.ca/en/resourcesGeneral/Documents/INS_SSU_Design_Criteria.pdf</ref> |
| − | * Ensure LID features meet municipal and provincial standards for [[infiltration]], [[flow control]], and [[water quality]] treatment. | + | *MOE's [https://www.ontario.ca/document/design-guidelines-sewage-works-0 Design Guidelines For Sewage Works (2016)]<ref>MOE. 2016. Design Guidelines For Sewage Works https://www.ontario.ca/document/design-guidelines-sewage-works-0#.</ref> |
| | + | *MECP's[https://ero.ontario.ca/public/2022-01/Draft%20LID%20Stormwater%20Management%20Guidance%20Manual%202022.pdf Low Impact Development Stormwater Management Guidance Manual Draft (2022)]<ref>MECP. 2022. Low Impact Development Stormwater Management Guidance Manual Draft. https://ero.ontario.ca/public/2022-01/Draft%20LID%20Stormwater%20Management%20Guidance%20Manual%202022.pdf</ref>. |
| | + | *MOE's[https://dr6j45jk9xcmk.cloudfront.net/documents/1757/195-stormwater-planning-and-design-en.pdf Ontario Stormwater Management Planning and Design Guidance Manual (2003)]<ref>MOE. 2003.Ontario Stormwater Management Planning and Design Guidance Manual. https://dr6j45jk9xcmk.cloudfront.net/documents/1757/195-stormwater-planning-and-design-en.pdf</ref> |
| | + | *STEP's [https://wiki.sustainabletechnologies.ca/wiki/Main_Page Low Impact Development Stormwater Management Planning and Design Guide Wiki] |
| | | | |
| | ===Step 3: Complete required documentation=== | | ===Step 3: Complete required documentation=== |
| Line 41: |
Line 45: |
| | Prepare a Design Report including: | | Prepare a Design Report including: |
| | * [[Engineering drawings]] | | * [[Engineering drawings]] |
| − | * Hydraulic calculations | + | * [[Infiltration: Sizing and modeling|Hydraulic calculations]] |
| − | * [[LID performance criteria]] | + | * [[Water quality|LID performance criteria]] |
| | * [[Inspections and maintenance|Maintenance plans]] | | * [[Inspections and maintenance|Maintenance plans]] |
| | | | |
| Line 62: |
Line 66: |
| | * Compliance assessment | | * Compliance assessment |
| | | | |
| − | ===Step 6: Conduct post-construction inspection and verification=== | + | ===Step 6: Conduct [[post-construction]] inspection and verification=== |
| − | * Inspect LID and stormwater systems to ensure they function as designed. | + | * [[Inspection and maintenance|Inspect]] LID and stormwater systems to ensure they function as designed. Refer to [https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide] and [https://sustainabletechnologies.ca/app/uploads/2018/04/SWMFG2016_Guide_April-2018.pdf Inspection and Maintenance Guide for Stormwater Management Ponds and Constructed Wetlands] |
| | * Complete "Post-Construction Verification" on relevant forms. | | * Complete "Post-Construction Verification" on relevant forms. |
| | * Document key performance indicators such as infiltration rates, flow control effectiveness, and pollutant removal efficiency. | | * Document key performance indicators such as infiltration rates, flow control effectiveness, and pollutant removal efficiency. |
| Line 69: |
Line 73: |
| | ===Step 7: Maintain ongoing compliance and record-keeping=== | | ===Step 7: Maintain ongoing compliance and record-keeping=== |
| | Establish a Stormwater System Maintenance Plan that includes: | | Establish a Stormwater System Maintenance Plan that includes: |
| − | * Routine inspections (e.g., [[sediment]] removal, [[vegetation]] management) | + | * Routine [[Inspections and maintenance|inspections]] (e.g., [[sediment]] removal, [[vegetation]] management) |
| | * Adaptive management strategies for system improvements | | * Adaptive management strategies for system improvements |
| | Retain compliance records for a minimum of 10 years. | | Retain compliance records for a minimum of 10 years. |
| − | Submit annual performance reports if required by municipal or provincial regulations.
| |
| | | | |
| | ==CLI-ECA application== | | ==CLI-ECA application== |
| Line 115: |
Line 118: |
| | | | |
| | ==Monitoring== | | ==Monitoring== |
| | + | |
| | + | CLI-ECA requires municipalities to implement a stormwater receiver monitoring program |
| | + | |
| | + | * Draft manual to be released in '''~January, 2026*''' |
| | + | * |
| | + | * Finalized in '''~June, 2026*''' |
| | + | * |
| | + | * Comes into enforcement '''~June, 2028*''' |
| | + | |
| | + | Existing real time monitoring or other instream monitoring programs CAs employ will provide data that municipalities need. |
| | + | |
| | + | '''*<small>Approximate dates to be confirmed</small>''' |
| | + | |
| | + | |
| | This section will be updated as information becomes available. | | This section will be updated as information becomes available. |
| | | | |