==CLI-ECA application==
===CLI-ECA application===
   
Municipalities in Ontario are required to submit a CLI-ECA application to the Ministry of the Environment, Conservation and Parks (MECP). If you are planning to establish a new municipal sewage collection system or municipal stormwater management system in a municipality that does not have a CLI ECA, arrange a pre-submission meeting with MECP <ref name = mecp2024></ref>. Below is MECP's Guide to Applying for the First Consolidated Linear Infrastructure Environmental Compliance Approval (2021)<ref>MECP. 2021. Guide to Applying for the First Consolidated Linear Infrastructure Environmental Compliance Approval. https://wcwc.ca/wp-content/uploads/2024/05/CLI-ECA-Application-Guide.pdf</ref> and an example Environmental Compliance Approval for the City of Peterborough's stormwater system (2023)<ref>Environmental Compliance Approval For a Municipal Stormwater Management System. https://www.peterborough.ca/media/ucbdw0wf/eca-number-145-s701-storm-issue-2.pdf</ref>. You can download (downward facing arrow on the top righthand side) and print (Printer emoticon on top right hand side) each PDF.
 
Municipalities in Ontario are required to submit a CLI-ECA application to the Ministry of the Environment, Conservation and Parks (MECP). If you are planning to establish a new municipal sewage collection system or municipal stormwater management system in a municipality that does not have a CLI ECA, arrange a pre-submission meeting with MECP <ref name = mecp2024></ref>. Below is MECP's Guide to Applying for the First Consolidated Linear Infrastructure Environmental Compliance Approval (2021)<ref>MECP. 2021. Guide to Applying for the First Consolidated Linear Infrastructure Environmental Compliance Approval. https://wcwc.ca/wp-content/uploads/2024/05/CLI-ECA-Application-Guide.pdf</ref> and an example Environmental Compliance Approval for the City of Peterborough's stormwater system (2023)<ref>Environmental Compliance Approval For a Municipal Stormwater Management System. https://www.peterborough.ca/media/ucbdw0wf/eca-number-145-s701-storm-issue-2.pdf</ref>. You can download (downward facing arrow on the top righthand side) and print (Printer emoticon on top right hand side) each PDF.
   Line 86: Line 85:  
<pdf width="450" height="400">File:Eca-number-145-s701-storm-issue-2.pdf</pdf>
 
<pdf width="450" height="400">File:Eca-number-145-s701-storm-issue-2.pdf</pdf>
   −
===Examples of annual reports===
+
==Annual reports==
 
Municipalities in Ontario are required to submit annual performance reports as per the conditions in the CLI-ECA, which must be made available to the public at no charge.
 
Municipalities in Ontario are required to submit annual performance reports as per the conditions in the CLI-ECA, which must be made available to the public at no charge.
 
Specific requirements for the report will be listed in the CLI-ECA, but typically include (MECP, 2024)<ref name = mecp2024></ref>:
 
Specific requirements for the report will be listed in the CLI-ECA, but typically include (MECP, 2024)<ref name = mecp2024></ref>:
Line 105: Line 104:  
<pdf width="300" height="400">File:2024 Annual Performance Report walkerton.pdf</pdf>
 
<pdf width="300" height="400">File:2024 Annual Performance Report walkerton.pdf</pdf>
   −
===Operations and maintenance manuals===
+
==Operations and maintenance manuals==
 
Conditions in the CLI ECA require the municipality to prepare and implement an operations and maintenance manual for the system. Requirements for what must be included in an O&M manual are listed in the CLI-ECA, but will typically include (MECP, 2024) <ref name = mecp2024></ref>:
 
Conditions in the CLI ECA require the municipality to prepare and implement an operations and maintenance manual for the system. Requirements for what must be included in an O&M manual are listed in the CLI-ECA, but will typically include (MECP, 2024) <ref name = mecp2024></ref>:
 
*operating and maintenance procedures for routine operation of the system
 
*operating and maintenance procedures for routine operation of the system
Line 120: Line 119:  
{{Clickable button|[[File:Screenshot 2025-09-11 120358.png|300px|link=https://sourcetostream.com/2025-track-1-day-2-schritt-macdonald/]]}}
 
{{Clickable button|[[File:Screenshot 2025-09-11 120358.png|300px|link=https://sourcetostream.com/2025-track-1-day-2-schritt-macdonald/]]}}
   −
===Design guidance===
+
==Monitoring==
 +
This section will be updated as information becomes available.
    