Changes

Jump to navigation Jump to search
Line 11: Line 11:  
[[File:Screenshot 2025-09-10 151234.png|400px|thumb|right|CLI-ECA flow chart (MECP, 2024)<ref>MECP. 2024. https://www.ontario.ca/page/municipal-consolidated-linear-infrastructure-environmental-compliance-approvals</ref>]]
 
[[File:Screenshot 2025-09-10 151234.png|400px|thumb|right|CLI-ECA flow chart (MECP, 2024)<ref>MECP. 2024. https://www.ontario.ca/page/municipal-consolidated-linear-infrastructure-environmental-compliance-approvals</ref>]]
 
===Step 1: Determine if your project falls Under CLI-ECA===
 
===Step 1: Determine if your project falls Under CLI-ECA===
Identify whether the proposed stormwater or LID project qualifies as a pre-authorized alteration under CLI-ECA. Common eligible projects include:
+
Identify whether the proposed wastewater or stormwater project qualifies as a pre-authorized alteration under CLI-ECA. Common eligible projects include:
 +
Stormwater:
 
* Storm sewer upgrades or extensions
 
* Storm sewer upgrades or extensions
 
* Alterations to stormwater management facilities (e.g., [[wet ponds]], [[dry ponds]], [[wetlands]])
 
* Alterations to stormwater management facilities (e.g., [[wet ponds]], [[dry ponds]], [[wetlands]])
 
* Implementation or modification of LID practices (e.g., [[bioretention]], [[infiltration trenches]], [[permeable pavements]])
 
* Implementation or modification of LID practices (e.g., [[bioretention]], [[infiltration trenches]], [[permeable pavements]])
 +
Wastewater:
 +
*Sewage works used for the collection, storage, pumping, and transmission of sanitary sewage, excluding treatment
 +
*All the eligible sewage works for collection of sanitary sewage that are owned by a municipality, or that may be transferred to a municipality pursuant to an agreement including pumping stations and pipes
 +
*Combined sewers and combined sewage storage structures that collect and convey both wastewater from residential, commercial, institutional and industrial buildings and stormwater runoff through a single-pipe system
 +
*Pumping stations including those that pre-condition sewage for further treatment downstream, such as the addition of coagulants, flocculants, disinfectants, or pH adjustment
 +
*Sewage works used for the management of residue from the system or odour control
    
===Step 2: Review design criteria and standards===
 
===Step 2: Review design criteria and standards===

Navigation menu